The reports shared with the executive level are the group report and project summary.
The project summary report compares the results from the group with the general averages across the same age group. This summary takes into consideration the participant’s subjective feelings, most popular chosen goals and possibly any recommendations given by the Firstbeat coach. There must be a minimum of 20 participants in a group to be able to produce a project summary report.
The group summary report shows the average statistics from the group’s measurements. This report looks at a smaller group, so the minimum number of participants is 7 and there must be at least 21 days of total measurement data.
Firstbeat will create the anonymous group reports according to the segmentation agreed, making sure individual data protection applies. Based on these results, Firstbeat will offer follow-up recommendations.
Comments
0 comments
Please sign in to leave a comment.